Archives

|

January 25, 2023

Nafis 6

Employer: Mr. Saghafi Designer: Iman Modiri Status: Finished Year: 2020 Address: Emamreza Blv. Mashhad, Iran Materials: Travertine stone tiles Structure method: Concrete Frame Description: Nafis 6 project is a 6-story residential building located in Mashhad, Iran. The design process lasted about 4 months. The site of project has an...

Read More

|

January 25, 2023

South Vila

Employer: Mr. MalekiDesigner: Iman ModiriStatus: Under constructionYear: 2021Address: Saravan, Chabahar, Mashhad, IranMaterials: Travertine stone tilesStructure method: Concrete FrameDescription:South Vila project is a residential building located in Saravan, Iran. The design process lasted about 8 months. The site of project has an area of 1879 m2.

Read More

|

January 25, 2023

Aramesh

Employer: Mr. Rooband Foroush Designer: Iman Modiri Status: Under construction Year: 2022 Address: Naserkhosro St. Mashhad- Iran Materials: Travertine stone tiles, brick, Stainless Steel, thermal windows Structure method: Concrete Frame Description: Aramesh project is a 7-story residential building located in Mashhad, Iran. The design process lasted about 6 months....

Read More

|

January 24, 2023

Fereshteh Vila: Fereshteh

Client: Mr. Shakeri Designer: Iman Modiri Year: 2019 Location: Fereshteh St. Hashemieh- Mashhad Structure: Concrete Frame Status: Completed    

Read More

|

January 24, 2023

CIP Mashhad Interior Design

—      

Read More

|

January 24, 2023

CIP Terminal2 Competition

Client: CIP Mashhad Designer: Iman Modiri Year: 2019 Location: Airport – Mashhad Structure: Concrete Frame Status: Completed    

Read More

|

January 23, 2023

Sanabad

Client: Eng. Adibi & Eng. Vahedi Designer: Iman Modiri Year: 2021 Location: Sanabad 44 St. Mashhad Structure: RC Moment Frame Status: Completed      

Read More

|

January 23, 2023

Arghavan Vila: Arghavan

Client: Mr.AnsariDesigner: Iman ModiriYear: 2020Location: Arghavan St. Torghabeh- MashhadStructure: Steel frameStatus: Completed

Read More

|

January 22, 2023

Marina kish: Saieh Tower

Client: Mr.Sani Designer: Iman Modiri Year: 2021 Location: Kish Island Status: Completed      

Read More

|

January 22, 2023

Elahie 16 : Artin

Elahie 16: Artin Client: Dr. Torkzade Designer: Iman Modiri Year: 2022 Location: Elahieh 16 St- Elahieh Blvd- Mashhad Structure: RC Moment Frame Status: Under Construction      

Read More